Custom Built New Forest Luxury Home

Scheme: Built to clients own design with bespoke specification including handmade oak windows and conservatory under floor heating and rainwater harvesting.

Creation of new and coverted out buildings

Scheme: Garage extensions Oak framed buildings and general alterations.

New Dormer window inseted to match existing

Scheme: N/A

Office Fit Out or Shop Refurbishments

Scheme: N/A

Greenfield Mews

Client: Raglan Housing Association

Sitecrofts Role: Detailed design, building regulations and construction on a fixed price contract.

Scheme: Completed in mid 2007 by Sitecroft Limited this scheme was an unconventional design requiring considerable detailing in respect of weathering, service entry positions means of escape, and in depth negotiations with both Building Control and the Fire Officer. The scheme of 20 affordable flats and three substantial commercial shop units presented major problems with ground conditions which were contaminated and very variable requiring a major engineering solution, there was also very little space available for the construction of the significant building which at one point is four stories in height. The scheme was competed ahead of programme and on budget. Build time 13 months.

Shakleton House

Client: Western Challenge Housing Association

Sitecrofts Role: Detailed design, building regulations and construction on a fixed price contract.

Scheme: The development comprised four affordable flats which were constructed on behalf of Churchill Retirement Living as part of their affordable obligation on a redevelopment elsewhere in Lymington. The site was confined in the centre of Pennington. The development was completed well ahead of schedule and within budget. The design brief required an EcoHomes pass. The scheme has also achieved a Secured by Design Certification. Scheme completed in a period of 6 months.

Roeshot Mews

Client: Western Challenge Housing Association

Sitecrofts Role: Detailed design, building regulations and construction, on a fixed price contract.

Scheme: A redevelopment of a former petrol station comprising two separate but identical buildings of 8 affordable flats in each. The key feature of this scheme in addition to EcoHomes and Secured by Design was the extensive landscaping around the perimeter of the site. Again the development was completed ahead of programme and on budget. Build time 8 months.

Newington Court

Client: Western Challenge Housing Association

Sitecrofts Role: Detailed design, building regulations, construction on a fixed price contract.

Scheme: A residential redevelopment comprising of 6 affordable flats and two commercial units to the ground floor. This site was particularly confined to the extent that it was built on the back edge of the footpath and the only amenity space was through a 1.7m wide covered way to the rear. This necessitated construction of the structure in two halves with significant involvement in the problems of construction of new works abutting existing structures on both sides, extensive use of party walls agreements were necessary and negotiations with neighbours were paramount to the success of the scheme. The scheme was assessed under EcoHomes and the design and calculations of same where part of Sitecroft's contract. The scheme has also achieved a Secured by Design Certification. This scheme was completed ahead of programme and on budget, with a build time of 9 months despite of the need to divert a sewer and additional remediation which had not been anticipated.

The Old Pottery

Client: Blandford Estates Limited a 50/50 Joint Venture

Sitecrofts Role: Detailed design, building regulations and construction on a fixed price contract.

Scheme: Completed in mid 2008 by Sitecroft Limited this scheme was an interesting commercial redevelopment in picturesque Verwood sensitively situated between the Heritage Centre Museum and the United Reform Church detailed negotiations with the Planning Department and the Local Town council ensured the smooth route from concept to the finished product. The scheme was competed ahead of programme and on budget. Build time 11 months.